Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13713194

- Product Categories
- Silent expanders
- Static cracking agent
- Rock crushing agent
- Ore mining broken stone age..
- Concrete cracking agent
- Crack stones agents
- Soundless Cracking Agent
- Static expanders
- Blasting expanders
- Static blasting expanders
- Friendly Links
- home > Supply > Xianyang mining crushing expanders, Xianyang silent broken agent homegrown professional manufacturers
Xianyang mining crushing expanders, Xianyang silent broken agent homegrown professional manufacturers
Information Name: | Xianyang mining crushing expanders, Xianyang silent broken agent homegrown professional manufacturers |
Published: | 2015-06-06 |
Validity: | 46778888 |
Specifications: | 20kg / pcs |
Quantity: | 57888788.00 |
Price Description: | |
Detailed Product Description: | Xianyang mining crushing expanders, Xianyang silent broken agent homegrown professional manufacturers carbatex silent broken agent Operation carbatex building materials: rock expanders, concrete crushing agent Manufacturer Contact: Euro Manager Tel: 18890330053 QQ (micro-channel) number: 1097499450 1, carbatex silent broken agent preparation before construction: with according to the local air temperature, chemical temperature, mix the water temperature, to be broken body temperature, whether consistent with the requirements; check pharmaceutical packaging is damaged. Make sure to have the following before operating materials and items: (1) drug, (2) clean water, (3) buckets, mixing bowl, (4) poke a stick, (5) protective glasses (6) rubber gloves, (7 ) alternate clean water and towels. 2. Broken scheme design: Cloth front first to determine that at least one more free surface (free surface), drilling should be directed parallel to the free surface as possible; cutting rock or concrete in the same row drilling should be kept as far as possible on a plane. The more free surface, the greater the amount of broken stone units, economic efficiency is also higher. After crushing plan was finalized, the first to use the drilling rig. About diameter, pitch, hole depth and broken design, it should be crushed according to the specific circumstances. Such as: concrete structure: whether steel, rebar diameter, arranged situation; rock structure: behavior, joints, to be crushed in size. Pitch and row spacing (resistance line distance) Setting: size and hardness of the rock and row spacing pitch, concrete strength and reinforcement distribution is directly related to, the greater the hardness, the higher the concrete strength, reinforcement dense fabric reinforced when coarse pitch and row spacing smaller, otherwise large, pitch and row spacing layout. 3, drilling (1) Drilling diameter and the crushing effect is directly related to drilling too small, is not conducive to drug fully effective; drilling too easy punching. As noted in strength to be crushed, the hardness, the array density steel is recommended to use a diameter of 38-45mm drill. (2) drilling over water and residual ash high pressure wind washed off opening should be clean soilless Gravel. (3) Drilling depth is generally better in the 1-4 m. 4, agents according to the season and the temperature stirring choose to adapt carbatex HSCA demolition agent model agent, the amount of the actual number of expanders, the powdered medicament are mixed together with water into the pot quickly stir into a thick paste having fluidity is reached . For vertical holes drilled from the top down, the weight ratio of water and chemical is usually 0.34 to 1. For example, 5kg agents against 1.6kg of water. For horizontal hole, the slant-hole and vertical hole drilled from the bottom up, the weight ratio of water and chemical is usually 0.28 to 1. Under normal circumstances, the water temperature should be consistent with the climate temperature. The reaction is not ideal, usually associated with the climate temperature. If the weather temperature is below 0 ℃, it is recommended prior to mixing of water heated to 20 ℃ -30 ℃. Available sticks or hand-held mixer mixing stirring, stir together until uniform, making it liquid paste or clay-like, quickly poured into the hole can be. Mixing should have been with the medicine slowly into the water against the good, rather than water slowly pour medicament. Stirring constantly should be poured in. Pour and stirring faster, added to the water poured into the borehole from the agent to the end of time should be controlled within 5-10 minutes, or easy punching. First, efficient silent broken agent carbatex technical performance and indicators Model Temperature (℃) swelling pressure (MPa) 8 hours 24 hours 48 hours carbatex HSCA broken agent -I 35 persons 5 ≥30 ≥55 ≥90 carbatex HSCA cracking agent -II 25 persons 5 ≥20 ≥45 ≥60 carbatex HSCA broken agent -III 10 persons 5 ≥10 ≥25 ≥55 2. Jiaze efficient silent broken agent (carbatex HSCA broken agent) Scope and features: First, concrete , alteration or removal (2) of the old bridges, piers, roads, dams, culverts, pumping stations and other facilities of concrete; reinforced concrete or demolition (1), newly poured concrete over parts of the shrub removal, such as pile caps, piers, etc. ; (3), large equipment concrete foundation and concrete piles, columns, sets, blocks and other demolition; Renovation (4), highways, tunnels, subways, airports, power plants, oil depots and other concrete structures in and around or removed; Second, the broken rock excavation, tunneling (1), building foundation, excavation and crushing rocks pile caisson construction; (2), highway widening project in crushing rock foundation excavation; (3) , slope form, slope landslide in rock crushing; (4), municipal engineering gas pipes, water pipes, cables and other underground pipeline laying project in the rock excavation; three, mining and stone cutting. Granite, marble, white marble and other stone blocks economics of mining and cutting, the finished product rate increased by 3 to 4 times; IV.Project broken (1), the control of the pre-crack construction broken; (2), zhayao crushed two secondary crusher; five, instead of anchoring material tunnel, culvert construction; demolition and rock six kinds of concrete structures other inappropriate zhayao broken environmental conditions, furnace refractories and other brittle objects break project. The use of safe, efficient, uninterrupted traffic, no downtime. |
Admin>>>
You are the 30842 visitor
Copyright © GuangDong ICP No. 10089450, Long Shajia Ze Building Materials Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 30842 visitor
Copyright © GuangDong ICP No. 10089450, Long Shajia Ze Building Materials Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility