Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13713194
| No.13713194
- Product Categories
- Silent expanders
- Static cracking agent
- Rock crushing agent
- Ore mining broken stone age..
- Concrete cracking agent
- Crack stones agents
- Soundless Cracking Agent
- Static expanders
- Blasting expanders
- Static blasting expanders
- Friendly Links
- home > Supply > Yueyang dickite broken agent manufacturers, Yueyang silent expansive one ton how much money?
| Information Name: | Yueyang dickite broken agent manufacturers, Yueyang silent expansive one ton how much money? |
| Published: | 2015-06-04 |
| Validity: | 30000000 |
| Specifications: | 20kg / pcs |
| Quantity: | 8000000.00 |
| Price Description: | |
| Detailed Product Description: | Yueyang dickite broken agent manufacturers, Yueyang silent expansive one ton how much money? Third, the dosage and usage 1, selection: the amount of 8 ~ 15kg / m3. On the basis of the use of temperature, divided into three types: type use temperature, ℃ carbatex SCA broken agent 125 to 40 (summer) carbatex SCA broken agent 210 to 30 (spring and autumn) carbatex SCA broken agent 3-5 ~ 15 (Winter) 2 Hole: Punch parameters can be plastid aperture size (mm) pitch (cm) deep hole against the wire (cm) brickwork 35 ~ 50 30 ~ 45 H 40 based on the strength of broken objects ~ 60 Hard Rock 35 ~ 50 25 ~ 40 1.05H 30 ~ 50 rock cut 30 ~ 40 20 ~ 40 H 100 ~ 200 unreinforced concrete 35 ~ 50 30 ~ 40 0.85H 30 ~ 40 35 ~ 50 15 RC ~ 30 0.95H 20 ~ 30 NOTE: H-- broken body height, row spacing = (0.9 to 0.95) pitch. Diameter, pitch should be considered depending on the size of the strength member, the first member of a row of pitch no more than marginal 5 ~ 7cm. Against the line - Refers to visit the empty side of the row of holes straight away. 3, the use of temperature cracking agent at above 10 ℃, after construction was generally no need for exposure (rain out). If cracks are available irrigated seam attack, to accelerate their swelling effect. 4, the use of temperature carbatex silent broken agent at below 10 ℃, shall cover with mats after construction insulation, can pass into the steam for maintenance, especially in winter. 5, when broken agent use in negative temperature conditions, construction stirred with 40 ~ 60 ℃ hot water, and shall adopt the insulation or heating means, or may choose a less power consumption, a significant effect of the broken electric fajitas temperature, namely placing a 0.5mm heating wire and a plastic wire in each hole, the series or parallel they followed in 220V adjustable transformer, the voltage dropped to 50 ~ 100V, use low voltage high current continuously heated, to adhere to Jiaze silent broken agent slurry hydrated at 40 ~ 50 ℃. 6, within 2 ~ 3h after filling broken agent, do not look near the orifice to prevent accidental ejection appearance at the onset of eye damage. Need to wear protective glasses during construction. Broken mildly corrosive agents on the skin, the need to wear latex gloves during construction, if splashed on the skin should be washed immediately with water clean. 7, stirring: after pulping the agent use. Stirred with water thicker situation is appropriate, after stirring the slurry poured in 10min to all the hole and tamped, generally 1500 ~ 1750ml water maker 5kg (1 packet) broken agent, and stirred into a homogeneous paste with active resistance . 8. Filling: Filling holes should be finishing clean, without water and debris, holes must be dense. Straight hole: the slurry poured directly, without blocking the orifice. Horizontal holes: thick made of dry clay-like, twisted pieces of this agent will plunge hole and tamped. 9, according to "first neighborhood, after the center" of the infusion order grouting. When filling, it is necessary to successively into line, to prevent forming an air sandwich filling slurry to the aperture stop. Broken agent to use with the distribution, one should not mixing too much, mixing good slurry should be quickly loaded into the gun bore, such as loss of mobility, not continuous mixing water use. 10, before loading boreholes should look wet and dry boreholes for water absorption of boring cannon hole, the hole should be moist with water wall, then reload. Avoid a lot of moisture absorption slurry, hydration and decrease the impact crushing effect. Grout to fill in stages from inside the free surface, spaced 4h mercy. 11. Maintenance: spring and autumn season construction without maintenance, usually 5 ~ 20h after filling can be broken broken object, the choice of 40 ℃ at the mercy of water when mixing the following winter 5 ℃ construction, and shall adopt the insulation or heating means, After the grout is usually 20 ~ 30h can be broken objects broken. The construction of low temperature, the longer the object cracking crushing moment. Fourth, packaging, storage bags 5kg / bag, cartridge to 20kg / bags woven bag; dry storage, waterproof, moisture; storage period of 18 months. Yueyang dickite broken agent manufacturers, Yueyang silent expansive one ton how much money? |
Admin>>>
You are the 30842 visitor
Copyright © GuangDong ICP No. 10089450, Long Shajia Ze Building Materials Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 30842 visitor
Copyright © GuangDong ICP No. 10089450, Long Shajia Ze Building Materials Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

