Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13713194

- Product Categories
- Silent expanders
- Static cracking agent
- Rock crushing agent
- Ore mining broken stone age..
- Concrete cracking agent
- Crack stones agents
- Soundless Cracking Agent
- Static expanders
- Blasting expanders
- Static blasting expanders
- Friendly Links
- home > Supply > Xinxiang mine expanders, Xinxiang rock crushing agent, broken stone agent factory price
Information Name: | Xinxiang mine expanders, Xinxiang rock crushing agent, broken stone agent factory price |
Published: | 2015-06-02 |
Validity: | 300000 |
Specifications: | 20kg / pcs |
Quantity: | 8000000.00 |
Price Description: | |
Detailed Product Description: | Xinxiang mine expanders, Xinxiang rock crushing agent, broken stone agent factory price efficient static crushing agents Jiaze technical parameters Model Suitable temperature / ℃ swelling pressure / MPa 8h 24h 48h carbatex HSCA broken agent -I 35 ± 5 ≥30 ≥55 ≥90 Jiaze HSCA broken agent -Ⅱ 25 ± 5 ≥20 ≥45 ≥60 carbatex HSCA broken agent -Ⅲ 10 ± 5 ≥10 ≥25 ≥35 1, carbatex silent broken agent crushing mechanism and characteristics of efficient silent broken Jiaze agent is a high-performance powder crushed material security for the safe removal of concrete construction and mining cutting marble, granite. Jiaze HSCA broken agent with water into a slurry poured into the rock or concrete drill, the expansion by 8 ~ 48h pressure generated can be broken body cracks increases with time, cracks will continue to expand, which will help eradicate the job. Particularly applicable in the case should not be used zhayaobaopo crushing or demolition operations, safety, high efficiency, without interrupting traffic, no downtime. 2, drilling parameter design based on the existing construction experience drilling parameters (see table below), the design parameters of drilling two test sections below, where I test section drilled orifice located at dismantling elevation above 50mm, hole to the level of dumping under 30o, pitch 300mm, aperture 30mm, hole depth 400mm; orifice removal test segment elevation Ⅱ drilling at more than 50mm, hole to the lower horizontal tilt 30o, pitch 500mm, aperture 40mm, hole depth 500mm. Parameters to be broken object aperture / mm pitch / mm hole depth resistance line / mm amount / (kg / m3) of soft rock crushing 35 ~ 50 400 ~ 600 H 400 ~ 600 8 ~ 10 in the hard rock crushing 35 to 65 300 ~ 600 1.05H 300 ~ 500 10 ~ 15 rock cut 30 ~ 40 200 ~ 400 H 1000 ~ 2000 5 ~ 15 plain concrete crushing 35 ~ 50 400 ~ 600 0.8H 300 ~ 400 8 ~ 10 reinforced concrete crushing 35 ~ 50150 ~ 300 H 200 ~ 300 15 ~ 25 3, removal step (1) Hole :( recommendations of the Advisory carbatex building materials sales manager 18,890,330,053) (2) Chiang Khong: After drilling is completed, using high-pressure Delicate hole. Before filling the hole slurry cleaned of debris, to prevent water from entering the port diluted slurry affect the crushing effect, to extend the break time. (3) Filling: the hole with a pump blown clean of debris, will be broken by the agents HSCA carbatex stirred slurry poured into holes in a short time, and after 3 ~ 20h Hou Jiaze HSCA broken agent produces swelling pressure, can rock cracks, the crack over time will continue to expand. Finally, excavator mounted eradicate job levels after the fracture is formed, using picks and artificial splitting machine will be dismantled concrete wall broken loading Sinotrans. |
Admin>>>
You are the 30842 visitor
Copyright © GuangDong ICP No. 10089450, Long Shajia Ze Building Materials Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 30842 visitor
Copyright © GuangDong ICP No. 10089450, Long Shajia Ze Building Materials Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility