Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13713194

- Product Categories
- Silent expanders
- Static cracking agent
- Rock crushing agent
- Ore mining broken stone age..
- Concrete cracking agent
- Crack stones agents
- Soundless Cracking Agent
- Static expanders
- Blasting expanders
- Static blasting expanders
- Friendly Links
- home > Supply > Static blasting silent expansive factory Huainan, Huainan rock crushing agent Which is better?
Information Name: | Static blasting silent expansive factory Huainan, Huainan rock crushing agent Which is better? |
Published: | 2015-05-28 |
Validity: | 3000000 |
Specifications: | 20kg / pcs |
Quantity: | 800000.00 |
Price Description: | |
Detailed Product Description: | Static blasting silent expansive factory Huainan, Huainan rock crushing agent Which is better? Jiaze efficient silent broken agent, keeping the right way and the role of efficient carbatex silent broken agent has a very important value in the presence of a number of different projects in the areas of production, to improve our construction schedule provides no small contribution. When we conduct engineering and construction, it should be based on the material to be crushed, structure, shape and crushing requirements and other factors design diameter, pitch, hole depth and so on. For special projects, can be designed into the horizontal hole or holes tendency. Splitting the object process, no vibration, no noise, no flying rocks, no dust, no harmful gases. Especially non-ideal environment baopo broken tools. Jiaze efficient silent broken agent is a safe level of ordinary materials carbatex products will not occur in any combustion and baozha ignition, high temperature and pressure and impact conditions. But as in the transport, storage, use, and management is not the time, there is still a low level of risk. Jiaze silent broken agent is valid for 18 months, we need to pay attention to moisture, sun protection when storing. Placed indoors or under shed. Silent broken agent to act in many Jiaze mainly construction was not conducive to the construction and building process is carried out to avoid explosion engineering zhayao demolition broken: for example, the construction project, the tunnel rock: China Railway Construction in the case of rock tunnel construction; excavation foundation piles Rock excavation: construction walls, columns, beams, piers broken; building demolition: Mining: Coal mining mining industry, quarrying hotel construction in the pool excavation optimization; underwater excavation demolition of buildings and static crushing: water conservancy construction in the reservoir channel excavation, rock cutting, gold mining; highway construction remedy C70 concrete crushing; and so on. Note that free surface that is free surface have two or two or more to be effective, there is no free face to artificially create a free face, remember blind construction, waste material; rain, not construction, such as construction Please note cover hole mouth, keep water from entering; broken agent model can not be mixed, select the model corresponding season. If you have any questions, please contact Ouyang manager carbatex building materials sales manager. Jiaze efficient silent broken agent, which range widely with the continuous improvement and development of productive forces, the value of our highly efficient silent broken agent Jiaze more and more obvious, plays a very important role. Jiaze efficient silent broken agent is a new chemical static silent broken agent. It is suitable for marble, granite and other stone mining, but also to tap a variety of reinforced concrete structures (damage). According to customer's different needs of different design drilled to reach the desired cutting or crushing effect. Use crushed agent cost far less than other crushing and cutting tools. Jiaze silent broken agent process (steps: drilling → stirring → grout → cracking) reasonable operation of the program is our silent expansive use of the most critical aspects, it is directly related to the expansion effect. If designed properly, it may lead to serious consequences cracking too long or "orifices" not even cracking. General use, as follows: 1. Drilling: Drilling design follows, 1) diameter: 32-50 mm (pore size, the greater the resulting swelling pressure, the shorter the cracking time, but more than 50mm aperture punching happen easily ); 2) Pitch: 15-40 cm (the smaller the pitch, the shorter the cracking time according to different materials and objects aperture, the aperture is about 5-8 times); 3) hole depth: 50cm or more generally hole depth too shallow prone punch, but not more than five meters is appropriate. Please charge before the hole clean of dust or water. 4) row spacing: the distance between rows of holes: 0.3-3M (project fragmentation generally 0.3-0.9M, mine exploitation side expected to 1-3M,) 2. Proportion and amount: The amount of bulking agent: Due to different materials, bulking amount of about 6-20 kg / m3. The ratio of the amount of water: about 30% by weight of the bulking agent, such as 10 kg expanders with 3 kg of water. NOTE: When the ambient temperature is below 10 degrees Celsius, 40 degrees of warm water available stirring. 3. Mixing and mounting holes: the ratio of good expanders slowly added to the water, while adding while stirring, until the mixture was stirred into a paste slurry (a stirring preferably not more than 10 kilograms, the better mounting hole), then the stirred the slurry was poured into the wells within 5 minutes (without sealing). Note: The best hole mixing and loading time is not more than 10 minutes, the entire operation is preferably not more than 30 minutes. To reduce the chance of "punching or orifices" expanders after Bahrain, try to avoid hot summer fashion hole, try to avoid "be crushed its own temperature high" fashion hole. If it is long "row of holes," or deep, preferably more than the same mounting holes. When the ambient temperature is below 5 degrees, you can use straw mats or other things to cover the aperture hole insulation Bahrain. 4. When you want to break a large thickness of concrete, broken can be layered, layer thickness is approximately 1M appropriate. For special projects, can be designed oblique holes. For oblique hole or horizontal hole can make use of a catheter loading, or half the feed mix into a paste and knead strip material and then inserted into the hole scratch reality. 5. General cracks 2-7 hours, if still no cracks after 20 hours, indicating that the pitch of your design is too large, should be appropriate to add another line of holes along the drilling and poured into the product. 6. This product is available in three models, models use temperature range HSCA-Ⅰ 25-40 ℃ HSCA-Ⅱ 10-25 ℃ HSCA-Ⅲ -10-10 ℃ temperature ordered for stone mining and reinforced concrete damage when used The actual construction temperature should select the appropriate model, not interoperable. (But please do not worry, we'll temperature depending on the season, and give you the most suitable product model). Jiaze efficient silent broken agent for a very wide range, such as granite, marble, bluestone, limestone, jade, iron ore and other mining; excavation of tunnels and channels, subways and other underground construction of broken rock. Building demolition and concrete crushing: such as basic demolition columns, beams, walls, piers, dams, and other large equipment. |
Admin>>>
You are the 30842 visitor
Copyright © GuangDong ICP No. 10089450, Long Shajia Ze Building Materials Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 30842 visitor
Copyright © GuangDong ICP No. 10089450, Long Shajia Ze Building Materials Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility